Next: Deliverables
Up: Methodology/work description
Previous: Task 2:
To prepare the deployment of three Lacoste-Romberg
gravimeters which will be made available to the project by partners and cooperators. The gravimeters
will
be modified for continuous recordings through implementation of
electronic
feedback system with digital output. The gravimeters will be in
continuous
operation for most of the time but two of them will occasionally be
used
for other purposes during shorter periods. Selection of sites will be
done
in cooperation with WP 3 and the digital data from the
gravimeters
will be merged into the SIL data acquisition system.
Margret Asgeirsdottir
1999-09-07