The Subproject was divided into two Subparts, 5A and 5B.
Subpart 5A, SAR interferometry, was managed by contractor Kurt Feigl of CNRS.DTP in close cooperation with Freysteinn Sigmundsson of NVI (see 2.6), and Páll Einarsson of UICE.DG (see 2.8). A very significant collaboration was also with Didier Massonet and Helene Vadon at CNES in Toulouse. Subpart A has been carried out and finalized in accordance with the workprogramme.
Subpart 5B, GPS geodesy, was managed by associated contractor Freysteinn Sigmundsson of NVI (see 2.6), cooperating with Reynir Bödvarsson of UUPP.DGEO (see 2.2) and with IMOR.DG. The work has basically been carried out in accordance with workprogramme although there was some reorientation of priorities between the two tasks in accordance with obtained results.